B. USER GUIDE 3. RECOMMENDATIONS FOR OPERATION AND MAINTENANCE
PAGE
28 / 51
Installation and User guide – ECOROCK - Systems – 26-05-2016
3.
OPERATING & MAINTENANCE RECOMMENDATIONS
If you have not subscribed to a service and maintenance contract, consult a BIOROCK® Certified or
a BIOROCK® trained and approved company for the maintenance on your sewage treatment plant.
Contact your dealer if necessary or contact us for more details about the closest dealer to you.
The summary below indicates the commissioning of your sewage treatment plant.
Your sewage treatment plant can be free from any failures as the BIOROCK® system does not require
electricity. (In normal operation, and following the maintenance recommendations)
GENERALLY:
Every year:
Visually check the water tightness of the complete system
Check the ventilation
Check if there are any smells exiting the tanks
PRIMARY TANK
Every year:
Check the sludge level
Empty the Primary Tank if the sludge level is > 50%
Change the effluent filter if necessary or change after emptying the Primary Tank
Take a sample of the effluent form the Primary Tank and check quality visually
ECOROCK UNIT
Every year:
Clean the water distribution pipe
Check and re-adjust the water distribution pipe if necessary
Check the first layer of BIOROCK® Media
Rinse or replace the first layer of BIOROCK® Media if necessary
Remove and clean the alarm
Take a sample of the outgoing water (final effluent) and check for clearness and odour.
Clearness means that the water contains few suspended particles. The colour may vary
from neutral to dark yellow. The odour of the water will normally be neutral to light
ammonia.
Neutral
Dark yellow