Burner profile
20kW
Content
- boiler frame;
- fuel tank;
- fuel transporter with burner, fan, motoreducers and electric motor;
- boiler controller (automation);
- boiler pass, user manual and warranty sheets.
Boiler installation
-
Boiler installation works must be performed by the authorised persons having the respective qualifications.
-
It is necessary to prepare a project of the boiler-house where the boiler is to be installed according to the
effective laws and requirements in the Republic of Lithuania.
-
The boiler must be installed pursuant to the effective requirements. The manufacturer assumes the liability
for direct and indirect losses that emerged in case of improper installation of the boiler.
Selection of boiler power
-
Properly selected size of boiler, i.e. its thermal power, conditions the efficiency and effectiveness of the
boiler.
-
The boiler shall be selected so that its heating power would meet the thermal losses of the object.
Boiler installation place
-
The boiler shall be installed in a place the conditions of which meet the effective requirements.
-
The smallest distance of the boiler contour from the walls is 300 mm. It is also necessary to leave a safe
distance from combustible materials, electricity and gas pipeline.
-
It is recommended to store the boiler on a ground of non-combustible materials which is by 100 mm wider
than the contours of the boiler and 300 mm wider than the front part of the boiler. The height of the
foundation shall be approx. 100 mm.
IMPORTANT! The boiler-house shall be fitted with a gravitational ventilation and it is necessary to
ensure the passing of sufficient fresh air to the room of the boiler house to meet the costs of the certain
boiler, in view of its power.
This pre-condition is necessary to ensure proper use of boiler and
security.