Bioer ThermoShaker MB-202 Operation Manual Download Page 3

Operation Manual for Oscillating Dry Bath                                                                      Important Notes 

 

II

 — 

 

Important Notes 

1. General Practice   

 

Caution

 

Important information is contained in any item and should be carefully read. Failure 
to  observe  the  instructions  would  result  in  damage  to  or  malfunction  of  the 
equipment. 

 

Warning! 

The warning message requires extremely careful operation of a certain step. Failure 
to observe the instructions may result in serious personal injuries. 

 

2. Safety 

During operation, maintenance and repair of this instrument, the following basic safety measures 

shall be observed. In case of failure to follow these measures or the warnings or notes indicated herein, 

the basic protection provided by the instrument, its safety criteria of design and manufacture, and its 

predicted use range would be impaired. 

Hangzhou Bioer Technology Co., Ltd. would be irresponsible for any consequence resulted from 

the user’s failure to observe the following requirements. 

 

Caution:   

This instrument is for indoor use.   

 
a) The ground connection   

To  avoid  the  electric  shock,  the  input  power  line  must  be  reliably  grounded.  The  instrument  is 

equipped with the three-pin plug that has the third pin (the pin connects the ground), therefore, the plug 

shall be used with the grounded power socket only. This is a kind of safety device. If the plug cannot 

be plugged into the power socket, please ask the electrician to install a correct power socket, so as to 

make the grounded plug to work for safety. 

 

b) Keeping apart from the live circuit 

The  operator  shall  not  disassemble  the  instrument  without  permission.  Only  qualified 

professionals are  allowed to  replace  elements  or adjust  the  machine inside.  Replacement  of elements 

under energizing state is prohibited. 

 

c) Be careful of the power supply 

 

Before  the  instrument  is  connected  with  the  AC  power  source,  the  voltage  of  the  power  source 

shall  be  the  same  with  the  required  voltage  of  the  instrument  (a  deviation  of 

10%  is  allowed).  The 

rated load of the power socket shall not be lower than the requirements of the instrument. 

 

d) Be careful of the power line 

Usually,  the  instrument  shall  use  the  power  line  attached  to  it.  If  the  power line  is  destroyed,  it 

Summary of Contents for ThermoShaker MB-202

Page 1: ...ThermoShaker Mixing Block MB 202 Type Oscillating Dry Bath Operation Manual H a n g z h o u B i o e r T e c h n o l o g y C o L t d...

Page 2: ...l at any time without notice All rights reserved Without prior written consent from Hangzhou Bioer Technology Co Ltd any part of the manual shall not be duplicated reproduced or translated into any ot...

Page 3: ...use a The ground connection To avoid the electric shock the input power line must be reliably grounded The instrument is equipped with the three pin plug that has the third pin the pin connects the gr...

Page 4: ...ect shall not be less than 25cm Also don t use the instrument on loose or soft surface or the air inlet at instrument bottom might be blocked Excessive temperature would impair the test performance or...

Page 5: ...by material and manufacturing defects within 12 months after goods delivery Hangzhou Bioer Technology Co Ltd is responsible for selectively repairing and replacing instruments with confirmed defects w...

Page 6: ...AND STORAGE CONDITIONS 2 3 BASIC PARAMETERS AND PERFORMANCE 2 CHAPTER III PREPARATORY WORK 4 1 STRUCTURE DIAGRAM 4 CHAPTER IV OPERATION GUIDE 5 EXAMINATION BEFORE STARTUP 5 CHAPTER V FAULT ANALYSIS A...

Page 7: ...nd culture of all kinds of molecular biological experiments with oscillation requirements etc This product has the following characteristics LCD true color high brightness display Simultaneous display...

Page 8: ...ient temperature 10 C 30 C Relative humidity 70 Power supply AC220V 22V 1 5A 50Hz 1Hz Surface for placement Horizontal stable Caution Before using the instrument please confirm whether the working con...

Page 9: ...25 to 95 Drop 10 from the room temperature Drop from 95 to 25 A 384 12min 12min 12min 3000rpm 0 36 Yes B 96 0 2mL 12min 12min 12min 2000rpm 0 33 Yes C 54 0 5 mL 12min 12min 12min 2000rpm 0 43 None D 3...

Page 10: ...tructure operating keyboard and function of each button of the instrument as well as the preparatory work before the startup When using this instrument for the first time familiarize yourself with the...

Page 11: ...ss the module button the module will be set up and separated from the host Examination Before Startup Please confirm the following content before plugging the plug into the power socket 1 Whether the...

Page 12: ...will enter the main interface The main interface includes Program Single Point Set System Inching these four option buttons Main Interface 2 Program editing Click the Program option in the main inter...

Page 13: ...than or equal to 2 click Delete to delete the selected section File Editing Interface In the file editing interface click Add to add a section after the selected section and enter the section informat...

Page 14: ...on time and pause time are required to be set when the intermittent oscillation is selected Select the corresponding time and set the time with the 12 keys on the right Click OK to set successfully cl...

Page 15: ...Guide 9 will pop up Select Yes to overwrite the existing file select No to go back to the file saving interface and finally save the file after modifying the file name After the file is saved success...

Page 16: ...interface The running interface displays the information of the running section including which section is currently running the current temperature the remaining constant temperature time of the sec...

Page 17: ...that the program running has finished Click OK in the End of Run prompt box to return to the main interface 5 System settings In the main interface click System to enter the system settings interface...

Page 18: ...s Firmware bin After the above operation a firmware upgrade U disk for the oscillating dry bath is made successfully Insert the firmware upgrade U disk into the USB interface of the instrument press a...

Page 19: ...t the time of oscillating operation the instrument body vibration is very large accompanied by abnormal sound The wrong module parts are applied Replace the module parts Contact the supplier or manufa...

Page 20: ...r manufacturer The fan is damaged or not running 7 The module is neither heated nor cooled The temperature sensor is damaged Contact the supplier or manufacturer The cooler is damaged 8 The vibration...

Page 21: ...15 Appendix 1 MB 202 Wiring Diagram...

Reviews: