2/38
77-2985-R0.5
EN
Table of Contents
1: System Depressurization Procedure………...4
2: Cleaning and Maintenance……...……………..5
2.1: Preventive Maintenance…………….6
2.2: Maintenance Schedule……………...7
3: Component Names and Locations……........8
3.1: Component Descriptions…...…..….9
4: Control Enclosure ………………………………...10
4.1: Control Enclosure Interior………….11
4.2: Control Board Detail………………….12
4.3: Solenoid Manifold Detail…………….13
Assembly Lubricant Note……………………………14
5: Color Change Valve (CCV)...………………….15
5.1: Valve Troubleshooting……………...15
6: Color Stack– 5 Color………………….……..…. 16
6.1: Color Stack Parts List…………….….17
6.2: Color Stack Rebuild…………………..17
7: Mix Manifold………………………...……..……...18
7.1: Mix Manifold Maintenance………...19
7.2: Injector Assembly……..………….….19
7.3: Injector Assembly Repair………..…19
8: Fluid Panel Components………………………..20
9: Flow Meter Guide………………….................21
9.1: Disassembly and Servicing ……….21
10: Dispense Pump…………………………………..22
Pump Operation………………………10.2
Drive Assembly…………………………10.3
Fluid Assembly…………………………10.4
Dispense Pump Parts List………....10.5
Dispense Pump Flow Sensor………10.6
Flow Sensor Calibration…...10.7
Flow Sensor Installation……10.8
Dispense Pump Removal……………10.9
Seal Replacement Procedure………10.10
Limit Set Procedure………………….10.11
Pump Troubleshooting Checklist..10.12
Pressure Transducer Electrical….10.13
Reassembly Callouts……………………………..4.1
Solenoid Stacks………………11.4
Alarm Guide…………………………………….13.1
Power Outage Cleaning Procedure…….14.1
Trigger Line Connection Reference.14.2
Enclosure Air Plumbing ……………………..15.1
Connecting Direct Power…………………..16.1
Electrical Diagrams………………………….17.1
Pneumatic Diagrams…….………………….17.2
Summary of Contents for GEMS
Page 16: ...16 38 77 2985 R0 5 EN 6 Color Stack 5 Color 240 3230 5 Thread Sealant ...
Page 22: ...22 38 77 2985 R0 5 EN ...
Page 31: ...77 2985 R0 5 31 38 EN 17 1 Electrical Diagrams ...
Page 32: ...32 38 77 2985 R0 5 EN ...
Page 33: ...77 2985 R0 5 33 38 EN ...
Page 34: ...34 38 77 2985 R0 5 EN ...
Page 35: ...77 2985 R0 5 35 38 EN ...