- Page 5 -

STEP THREE

 — 

Install platform

 C

 on side 

braces 

B

 so that platform is fully seated within 

inner channel on top of side braces.

STEP FOUR

 — 

Rotate the platform clips 

into the engaged position.

PUSH

DISENGAGED

ENGAGED

STEP SIX

 — 

(When recommended or required)  When platform height exceeds 4 ft., guard 

railing is recommended, but is not required.  However, OSHA requires guard rails for all platforms 

10 ft. or higher.  Install each guard rail panel (2 required) into sockets in side braces 

B

 and secure 

with lock pin.  Be sure that guard rail gate swings inward over the platform.

GUARD RAIL SOCKET 

IN SIDE BRACE

STEP FIVE

 — 

Install 4 casters 

D

 into legs of end frames 

A

 and pin with snap pins 

E

.  Set brake 

on each caster.

GUARD RAIL LEG

SIDE BRACE

PLATFORM

CHANNEL

•  Recheck all side brace lock pins for full engagement and that the Saf-T-Lok

® 

is in the locked 

position before accessing platform.

•  Recheck platform to be sure it is properly seated within side brace channel and the platform 

clips are fully engaged before accessing.

•  When accessing platform, climb over top of end frame ladder — 

do not swing around side 

of end frame.  Swinging around side of end frame will cause scaffold to tip over resulting 

in serious injury or death.

WARNING

WARNING

Guard rail must be installed so that gate swings inward over platform.  Failure to install guard 

rail properly may result in serious injury or death!

Unique design allows the guard railing to stay at the platform level at all times.  

Guard railing does not fit on the frame but in the sockets on the platform brace.

GUARD RAIL PANEL

Panel Guard - 1 unit shown

(2 required per work level)