Install platform
C
on side
braces
B
so that platform is fully seated within
inner channel on top of side braces.
STEP FOUR
—
Rotate the platform clips
into the engaged position.
PUSH
DISENGAGED
ENGAGED
STEP SIX
—
(When recommended or required) When platform height exceeds 4 ft., guard
railing is recommended, but is not required. However, OSHA requires guard rails for all platforms
10 ft. or higher. Install each guard rail panel (2 required) into sockets in side braces
B
and secure
with lock pin. Be sure that guard rail gate swings inward over the platform.
GUARD RAIL SOCKET
IN SIDE BRACE
STEP FIVE
—
Install 4 casters
D
into legs of end frames
A
and pin with snap pins
E
. Set brake
on each caster.
GUARD RAIL LEG
SIDE BRACE
PLATFORM
CHANNEL
• Recheck all side brace lock pins for full engagement and that the Saf-T-Lok
®
is in the locked
position before accessing platform.
• Recheck platform to be sure it is properly seated within side brace channel and the platform
clips are fully engaged before accessing.
• When accessing platform, climb over top of end frame ladder —
do not swing around side
of end frame. Swinging around side of end frame will cause scaffold to tip over resulting
in serious injury or death.
WARNING
WARNING
Guard rail must be installed so that gate swings inward over platform. Failure to install guard
rail properly may result in serious injury or death!
Unique design allows the guard railing to stay at the platform level at all times.
Guard railing does not fit on the frame but in the sockets on the platform brace.
GUARD RAIL PANEL
Panel Guard - 1 unit shown
(2 required per work level)