Mounting & Installation/Start-up
Preparing CLP for start-up
Ensure sump is completely free from any contamination.
Apply grease into the sump of the CLP and operate the CLP.
Observe the suction action of the pump on the grease . Open bleed screw and allow grease to run through using 3mm hex key.
Completely fill the sump of the CLP and pause operation of the CLP.
Mounting
CLP should be mounted horizontally, via the 2 mounting lugs on the baseplate of the pump.
Mounting Centers:
306 mm
Mounting Bolts:
M8 or 5/16”
(Lengths dependent on the specific installation)
Use of flat & locking washers is also recommended.
Mounting hardware/brackets is not provided.
In identifying the appropriate location for the CLP, care should be given to:
1.
Overhead clearance necessary for replacement of cartridges, particularly of the Type A cartridge. Refer to the Technical
Data section for clearance dimensions necessary for the various cartridge types.
2.
Ease of Access to cartridge for regular replacement
3.
Access to venting screw. Refer to Pump Connections Section.
4.
Proximity to Divider valve and lubrication points. Refer to Configuring the System section for recommendations on
lengths of lubrication lines.
5.
Electrical Connections
6.
Access to Controller on Motor Cover (under the flap) for programming the CLP.
1. Fill Sump with Grease
2. Operate CLP
3. Open Bleed Screw