42
1943
1565
Hardware
Other Parts
Step 24: Connect Monkey Bar Assembly to Fort
Pre-drill all pilot holes using a 1/8” drill bit before installing the lag screws.
2 x
#8 x 1-1/2” Wood Screw
6 x
#12 x 1” Pan Screw
1 x
5/16 x 3” Hex Bolt (5/16” lock washer, 5/16” flat washer, 5/16” t-nut)
1 x
1/4 x 2-1/2” Lag Screw (1/4” flat washer)
1 x MB Mount Strap
1 x MK Bracket
S6
Fig. 24.2
Fig. 24.3
21-1/2”
LS2
G10
A:
With a MK Bracket attach (1565) MK Rail Short to (2033) MK Mount with 1 (G10) 5/16 x 3” Hex Bolt (with lock
washer, flat washer and t-nut) and 4 (S6) #12 x 1” Pan Screws, as shown in fig. 24.1 and 24.2.
B:
Measure 21-1/2” from top of (1943) MK Rail Long to top of (1890) CE Gap Board, then with a MB Mount Strap
attach (1943) MK Rail Long to (1931) Post using 1 (LS2) 1/4 x 2-1/2” Lag Screw (with flat washer) in the centre
hole and 2 (S6) #12 x 1” Pan Screws in the 2 end holes as shown in fig. 24.3.
C:
Tighten the top bolt in (2033) MK Mount.
D:
Make sure (1227) CE Wall Board, from Step 18 is tight to the floor boards, then attach to (2033) MK Mount
using 2 (S2) #8 x 1-1/2” Wood Screws. (fig. 24.4 and 24.5)
S2
5/16” Flat
Washer
5/16” Lock
Washer
5/16”
T-Nut
G10
2033
S6
x 4
MK Bracket
1565
LS2
S6
MB Mount Strap
1943
1890
S6
1931
1/4” Flat
Washer
Fig. 24.5
Fig. 24.4
2033
S2
1227
Fig. 24.1