34
Step 16: Floor Frame Assembly
Part 2
D:
Install 1 (1890) CE Gap Board tight to each end of the assembly attaching to (1761) Side Joist, (1903) Floor
Joist and (1908) Front Floor using 5 (S2) #8 x 1-1/2” Wood Screws per board. (fig. 16.5)
Wood Parts
Hardware
10 x
#8 x 1-1/2” Wood Screw
2 x
CE Gap Board 1 x 6 x 32-1/2”
S2
1890
Fig. 16.5
Swing Wall Side
1761
S2
S2
1890
1890
1903
1908
S2
S2