Rectification specification of long connection pipe:
The above long connection pipe rectification is the max.capacity under standard IDU capacity allocation.
Some of load configuration is as follow:
Max.system capacity: IDU capacity and the max.capacity of ODU, take the lesser one (two kinds of
algorithms).
IDU allocation rate is below 100%
The max. capacity of ODU=the capacity in the ODU capacity rectification table when the allocation rate
is 100%×long connection pipe rectification coefficient of the furthest IDU.
IDU allocation rate is 100%
The max. capacity of ODU=the capacity corresponds to the allocation rate in the ODU capacity
rectification table×long connection pipe rectification coefficient of the furthest IDU.
GMV6 DC Inverter VRF Units
Technical Sales Guide
107
Summary of Contents for GMV-1015WM/G-X
Page 104: ...102...
Page 105: ...GMV6 DC Inverter VRF Units Technical Sales Guide 103...
Page 106: ...104...
Page 107: ...GMV6 DC Inverter VRF Units Technical Sales Guide 105...
Page 108: ...106...
Page 130: ...128...