Installation
All installation and connection work may be carried out
by qualified and approved specialist staff only ! The legal
regulations as well as adjustment instructions of the
plant operator have to be observed!
1 Optical alignment device
2 Fibre optic cable
3 Union nut M30
4 SKL
5 Union nut SW55
6 Adapter flange
SW55 to G1“
7 Heating insulator
or double nipple
8 Swivel mount
In order to ensure perfect flame monitoring, the correct
and low-vibration position of the sighting tube relative to
the flame is a significant pre-requisite. For selective
burner monitoring, the device has to be installed in such
a way that the primary combustion zone in all load
ranges is inside the visual angle of the compact flame
controller. The sighting axis must, if possible, intersect
the first third of the flame of the own burner. The exten-
sion of the sighting axis must not intersect the first third
of the flame of other burners. Adjust the compact flame
controller so that an optimum sighting is obtained.
Summary of Contents for CFC 3000L
Page 2: ......
Page 11: ...General aspects 1 7 1 8 Declaration of conformity...
Page 24: ...Technical data 3 6...
Page 40: ...Transport Installation and Connection 4 16...
Page 45: ...Description 5 5 5 4 1 Image of a BUS system...
Page 48: ...Operation of the Compact Flame Controller 6 2...
Page 50: ...Care and Maintenance 7 2...
Page 52: ...Failures 8 2...
Page 57: ...Accessories 10 3...
Page 58: ...Accessories 10 4...
Page 59: ...Accessories 10 5...