4
OPERATION
1.
Verify that wheel brakes are in locked position (front two casters).
2.
Make sure stainless steel drain plug is in place in the cast aluminum water pan,
and fill it 1/2 to 3/4 full
3.
Make sure the polycarbonate
water pan cover is properly in place with the holes over the pan.
for steps 4,5 and 6 see fig.2
4.
Push the power switch to the "ON" Position. Always use this switch to turn the unit "ON" or "OFF".
5.
Set the temperature control to the desired cabinet temperature. 90°F to 110°F is recommended as
a starting position. Increase or decrease the cabinet temperature as needed to best suit your
application.
To select desired cabinet temperature:
1. Press SET key under cabinet temperature display.
.
2. Press INCREASE key or DECREASE key to adjust cabinet temperature.
3. Press SET key to lock-in desired cabinet temperature. (If you don't press the SET key the
temperature setting will revert back to previous setting).
6.
Set the humidity control to the #3 or #4 position. This can be increased if necessary to suit your
specific application.
7.
Make certain that the 18" x 13" sheet pan (not provided with proofer) that has been inserted in the
slides on the bottom of the base is under the square hole to catch any condensation.
8.
Verify that the door(s) is closed and latched.
9.
Allow approximately 30-45 minutes for the cabinet to achieve the necessary temperature and
humidity that you desire.
10.
The cabinet is now ready for product placement and the start of the proofing process.
Fig.2
Note:
Different products, or even different batches of the same product may require different cabinet
temperatures and humidity settings. This may result in longer, or possibly even shorter proofing times.
OPERATING TIPS
Always inspect wheel brakes before attempting to move the cabinet. Make certain that brakes are in the
locked position before placing cabinet into operation.
During "cold" start-up you may want to set the Humidity Control to the HI setting for 10 to 15 minutes to
accelerate the humidity process. Remember to re-set the Humidity Control back to the desired setting
before beginning the proofing process. Once the cabinet has been loaded with product and the proofing
Proofer Control Panel
Cabinet Temperature Display
Humidity Control
OPERATING INSTRUCTIONS
xxxxxxxx xxx xxx xxxxx xxxxx xxxxxxxx
xx xxxxxxxxx xxxxxxxx xx x xxxxxxxx xxxxx
xxxxxxxxxxxxxxxxxxxx xxxxxxxxxxx xxx xx
x x xxx xxxxxxxx xxxxx x xxxxx xx xxxxxxxx
xxxxxxxxxxxxxxxxx xxxxxxxxxxxxx xxxxxxx
xxxx xxxxxxxxxx xxxxxxxxx xxxxxxxxxxx xx
xxx xxxxxxxx xxxxxxxx xxxxxxxxxxxx xxxxx
POWER
ON
CABINET TEMP.
CABINET HUMIDITY
SET
OFF
Power Switch
Temperature Control
Summary of Contents for Cinnabon PICA70-32-AED
Page 9: ...8 Amp rating 120v Models 13 amps...
Page 10: ...9 Amp rating 208 230v Models 7 5 6 8 amps...
Page 12: ...11 Notes...