8
7. RECOVERY TANK
A. Make sure that the recovery tank is properly mounted and that the hoses
are properly installed onto the fittings that exit the recovery tank caps.
B. Check that the caps are properly sealed.
8. SOLUTION TANK
A. Check that the cap is properly connected, and that the vent pin is pushed
in (A).
B. Check that the quick connect fitting is properly connected (B).
MACHINE PREPARATION
Summary of Contents for GENIE CE HD APS
Page 18: ...18 SQUEEGEE SYSTEM PARTS DIAGRAM 6 3 4 13 14 12 11 5 18 1 7 10 8 8 18 15 16 5 9 5 17 2 9 ...
Page 20: ...20 SQUEEGEE YOKE PARTS DIAGRAM 4 2 11 13 10 6 7 5 2 6 7 9 14 12 8 3 1 ...
Page 28: ...28 ELECTRIC SYSTEM PARTS DIAGRAM 2 6 4 3 5 3 7 10 2 9 1 8 ...
Page 30: ...30 ELECTRICAL DIAGRAM ...
Page 31: ...31 ...