2
OPERA
TION
33
GB
LUBRICANTS
To maximize the vehicle’s performance and ensure many years of trouble-free opera-
tion, we recommend using the following products:
Note
It is essential that all renewals should be performed with the products listed in the
table above.
RUNNING-IN
The running-in period lasts approximately 15 hours, during which it is advisable to:
1 During the fi rst 3 hours of operation the engine should only be used to approxi-
mately 50 percent of its power. In addition, the engine speed should not exceed
7,000 rpm.
2 For the next 12 hours of operation the engine should only be used to about 75
percent of its power.
3 Use the vehicle after properly warming up the engine.
4 Avoid travelling at constant speed (changing the speed causes the different com-
ponents to bed in evenly and more quickly).
This procedure should be followed each time piston, piston rings, cylinder, crankshaft
or crankshaft bearings are replaced.
WARNING
After the fi rst 3 hours or 20 litres of petrol change the engine and gear oil.
•
Always use high-octane unleaded petrol.
•
After using the vehicle on rough ground for the fi rst time, carefully
check the
tightening of all nuts and bolts
.
PRODUCT TYPE
SPECIFICATIONS
ENGINE OIL
BARDAHL XTC 15W-50
GEAR AND CLUTCH OIL
BARDAHL GEAR BOX 10W-40
BRAKE OIL
BARDAHL BRAKE FLUID DOT4
CLUTCH ACTUATOR OIL
BARDAHL BRAKE FLUID DOT4
FORK
OIL FUCHS
1091
TIE ROD GREASE
BARDAHL MPG2
LIQUID COOLANT
BARDAHL ANTIFREEZE PLUS
Summary of Contents for 2011 RS
Page 1: ...RR 4T 201 2 350 400 450 498 ...
Page 69: ......
Page 75: ......
Page 76: ...6 TROUBLESHOOTING 75 GB CONTENTS CHARTER 6 TROUBLESHOOTING INDEX ...