- 8 -
PREPARE WALL CABINET
1. Prior to wall cabinet installation, remove doors
and door mounting hardware.
2. Cut an opening into the bottom panel to the
dimensions shown.
3. Cut out openings for the duct and electrical
wiring.
4. Install cabinet on the wall and secure per
cabinet manufacturer’s recommendations. The
cabinet must be securely fastened to studs and
framing behind the drywall prior to hood instal-
lation.
Cabinet-
Widht
“A”
“B”
28-1/2”
15”
30”
34-1/2”
18”
36”
PREPARE THE HOOD
1. Loosley assemble both mounting brackets to
the hood using M4 x 30mm machine screws
and
fl
at washers.
2. Place the 8” damper/duct connector on top of
the range hood discharge opening. Remove
tape from damper
fl
aps. Secure with (4) 3.9 x
9.5mm screws.
NOTE: If the hood is used in the non-ducted
recirculation configuration, remove and
discard the aluminum damper
fl
aps.
3. Assemble wall spacer to the hood with (3) 3.9
x 9.5mm screws.
NOTE: The spacer is designed to
fi
ll a 5/8”
gap between the wall and the back of the
hood. If the gap is larger, a non-combustible
material that is in compliance with local
building codes must be used to
fi
ll this gap.
4. Remove foam block located between blower
and housing.
MOUNTING SCREWS
(3.9x9.5mm)
WALL
SPACER
MOUNTING SCREWS
(3.9x9.5mm)
MACHINE
SCREWS
(M4x30mm)
WASHERS
Summary of Contents for U102I
Page 13: ... 13 SERVICE PARTS MODEL U102I ...
Page 27: ... 27 PIECES DE RECHANGE MODÈLE U102I ...
Page 41: ... 41 PIEZAS DE REPUESTO MODELO U102I ...
Page 43: ... 43 ...
Page 44: ... 44 04308928 99043479E ...