Step 21 Install Doors & Hardware

4.

Before you fasten the hinges to the door

trim, temporarily prop the doors in the
opening. Leave a space at the top of the
doors and between the doors and the
side trim to allow room for the doors to
expand when they absorb moisture.

If your door opening is out of square,

the space around the doors will not be
even. You can remove and reposition
the side trim to make allowances for
this. The side trim does not have to be
flush with the frame of the door opening.
You can move the trim in or out to make
the door spacing equal.

5.

Install hinges to trim with 2" screws.

OSB Shim

1.

Lay the left door with the trim facing up. The

siding on the left door extends past the door trim.
See detail below.

2.

Install 5" hinges to the left side of the door frame.

To position the hinge properly, hold the rectangular
plate against the frame. Use 1-3/4" black screws.

3.

Install hinges to the right side of the other door.

6.

Install a barrel bolt on the lower back of

the door to secure this door in place when
closed. You will need to drill a hole for
the round shaft to drop into.

7.

Install another barrel bolt at the top of the

door.

Barrel Bolt  on the

back of left door

Install Door Latch

Left Door

Siding Extends Past Trim

Summary of Contents for the Riviera

Page 1: ...ive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright...

Page 2: ...ke the shipping pallet will be used for wall bracing The OSB sheathing will be used for roof sheathing Unpack the material from the pallet then disassemble the pallet The pallet is secured together wi...

Page 3: ...ts Shorten joist measurements if necessary to obtain 12 0 building width 1 Cut 2 two 2x4 joist headers to 16 0 Layout for 16 on center joist spacing X marks where floor joist will be placed Material D...

Page 4: ...ils per gusset 4 Install a 2x4 84 collar tie between the 2x4 boards Insure collar tie is parallel with edge of work surface see below Hold collar tie from moving with 2x4 blocks Install 12 x24 gussets...

Page 5: ...ollar tie in place in Step 1 3 Place 2 two 66 long 2x4 truss members at the top of the truss jig 4 Install the gable plate assembled above to the truss legs with 2 1 2 wood screws see detail B Install...

Page 6: ...top of the gable frame and gable studs Use 8d galv nails along the bottom edge 2 Install 55 1 2 wall studs red ends between the top and bottom plates Assemble wall frames with 10d sinkers two 2 nails...

Page 7: ...wall frame Install the first full width siding panel with the LAP edge extending 3 1 2 past the wall frame Work from left to right The siding will extend 3 4 below the bottom plate Use 8d galv nails...

Page 8: ...siding panel with the LAP edge extending 3 1 2 past the wall frame Work from right to left The siding will extend 3 4 below the bottom plate Use 8d galv nails spaced 12 apart Step 7 Install Siding on...

Page 9: ...studs of the wall panel The left end will be flush edge of short stud The right end will extend beyond long stud by 1 1 2 to receive header support Siding will extend 3 4 below 2x4 plate Use 10d sink...

Page 10: ...p and bottom wall plates 4 Install 74 1 2 long wall stud so that edge of siding is center of stud Front Wall Panel w Siding 66 1 2 Long 2x4 Plate 72 Long 2x4 Plate 2x4 Stud w Header Support 2x4 Stud w...

Page 11: ...e pre built 59 1 2 door header between the front wall panels Nail through the wall stud on the larger panel into the end of the header Nail through the top wall plate that extends over the door header...

Page 12: ...alv nails Siding Shim 4 Install a 46 1 2 long 2x6 on the right sidewall 5 Install 2nd 26 1 2 filler flush with the angle part of the front wall The filler will be 3 4 below top of the wall frame 6 Cut...

Page 13: ...with bottom of 2x6 sidewall plate The filler should be 3 4 below the top of the wall frame Nail with 10d sinkers 2 Install a 52 1 4 long 1x4 trim board against the filler board and flush with the top...

Page 14: ...ame when marking the location of the first truss Continue 24 spacing to front wall Important When marking the opposite wall place the X mark on the same side of the line so your trusses are parallel w...

Page 15: ...at the 49 mark and flush with rear gable siding Insure sheathing meets the center of the truss at the break Use 7d sinkers spaced 12 apart The top row of roof sheathing will be about 1 below the ridg...

Page 16: ...of the overhang This panel will slide in the gap between the filler board and 1x4 trim and rest on the 2x6 tie plate Use 6d glav nails 1 Install 1 one 96 long 2x4s against the siding and under roof s...

Page 17: ...s 3 Install a 52 long x 2 1 2 wide board with the angle end at the peak of the roof 4 Install a 45 long x 2 1 2 wide board 5 Repeat steps 1 4 for opposite side 1x6 Trim Board Step 18 Install Gable Tri...

Page 18: ...with the bottom edge of the siding Tack these boards with a couple nails you may want to adjust the trim later when you install the doors Use 8d galv nails 2 Install shingles according to the instruct...

Page 19: ...in or out to make the door spacing equal 5 Install hinges to trim with 2 screws OSB Shim 1 Lay the left door with the trim facing up The siding on the left door extends past the door trim See detail...

Page 20: ...Truss Hangers 6 ea 5 Door Hinges 1 ea 4 5 Door Latch 2 ea 6 Barrel Bolts 6 ea 1x4 Metal Plates 1 Bottle Glue and Bay of Screws 18 Truss Rafters 2x4 96 7 Collar Ties 2x4 84 6 Wall Studs 2x4 74 1 2 4 Wa...

Reviews: