4.
Install a 67-1/2" door header between the
front wall panels. Secure with 10d sinkers.
Nail through the top 2x4 plate and the
wall stud.
2.
Disassemble the shipping pallet and remove the (4) four 2x4s from each pallet. The bit for the
screws is in the hardware bag. Use (2) two to brace the door walls to hold them straight. Save
the other 2x4s, they will be used in a later step.
2.
Remove 2x4 blocks. Save blocks, some
will be used when installing gables. The
remaining (2) two trusses with one gusset
will be used in a later step.
Step 6
Set Walls
1.
Erect wall panels. IMPORTANT: Make sure walls are plum and square. Secure wall panels
together at the corners. Use (4) four 10d sinkers per corner. Nail wall panels to the floor. Nail
through the bottom plate. Space 10d sinkers 24" apart.
Step 5
Install Collar Ties
1.
Select (5) five trusses that have gussets installed on
both sides and install a 1x4-72" long primed board as
shown. Use (4) four 6d common nails on each end.
1x4 Collar Tie
Board is Primed
3.
Install the remaining (2)
two full width siding
panels on the side walls.
2x4 Wall Brace
Full Width Siding
Full Width
Siding
67-1/2" Door
Header