Assembly instructions according to
DIN EN 1176 2008
Page 5 of 11
2.2
Installation instructions for connection anchors
The diameters and depths of the fixing bores, as well as the hardening times are to be observed. Prior to
application, make sure the resin flows like honey from a warm to the touch cartridge. Do not use damaged
cartridges. Store cartridges cool in the original packaging and protect against direct exposure to sunlight.
Brush or blow out the bores. Drive the anchor rod to the bottom of the fixing bore by turning and
hammering (with a drill hammer). Mortar coming out of the fixing bore is to be subsequently removed.
Installation is correct when the setting mark of the anchor rod is flush with the edge of the bore and the
ring gap has been completely filled with mortar.
Hardening times:
Temperature in
Hardening time (min)
Hardening time (min)
the ground (°C)
with dry concrete
with wet concrete
over +20°
10 min.
20 min.
+11° to +20°
20 min.
40 min.
+5° to +10°
60 min.
120 min.
-5° to +4°
300 min. (=5h)
600 min. (=10h)
2.2.1
Installation of connection anchor M16
Position central foundation slab on the foundation; mark and drill bores on the basis of the foundation part.
These are drilled Ø18 mm 125 mm deep into the foundation with a percussion drilling machine and the
percussion drill. Proceed as described in point 2.2 and in the illustrations. Position the foundation part on
the foundation again and tighten with the help of an open-end wrench (SW 24) or a ratchet with a long
socket (SW 24). The ring nuts must be glued in with high-strength screwlock.