Central mast climbing structure 2900
Berliner Seilfabrik GmbH & Co.
Lengeder Straße 2/4
13407 Berlin
Germany
Tel.
Fax
Homepage
:
:
:
:
+49.(0)30.41 47 24-0
+49.(0)30.41 47 24-52 or -35
+49.(0)30.41 47 24-33
info@ play-connection.com
www.play-connection.com
Version: April 2014
Assembly instructions according to
DIN EN 1176 2008
Page 6 of 11
2.2.2
Installation of connection anchor M20
The fixing bores for the connection anchors can be drilled after the markings for the outer foundation
points have been set. These are drilled Ø25 mm 170mm deep into the foundation with a percussion
drilling machine and the percussion drill. Proceed as described in point 2.2 and in the illustrations.