Central mast climbing structure 2900
Berliner Seilfabrik GmbH & Co.
Lengeder Straße 2/4
13407 Berlin
Germany
Tel.
Fax
Homepage
:
:
:
:
+49.(0)30.41 47 24-0
+49.(0)30.41 47 24-52 or -35
+49.(0)30.41 47 24-33
info@ play-connection.com
www.play-connection.com
Version: April 2014
Assembly instructions according to
DIN EN 1176 2008
Page 3 of 11
1
Assembly personnel and tools
1.1
Personnel
A minimum of 2 skilled persons are required for the correct assembly of this equipment.
1.2
Tools
The following tools are required for assembly:
1.
Lever (round bar max. Ø12 mm, length ≈ 50 cm) or similar
2.
Box or open-end wrench SW 24
3.
Box or open-end wrench SW 30
4.
Open-end wrench SW 36
5.
(Percussion) drilling machine
6.
Percussion drill D=18 mm
7.
Percussion drill D=25 mm
8.
Lubricant (grease)
9.
Commercially available hammer
10.
Spade
Unavailable required tools can be supplied at a charge.
1.3
Packing list
1.
Net with mast head and accessories completely pre-assembled
2.
Foundation slab
3.
Mast
4.
Connection anchor complete with nuts, washers and mortar cartridges, positioning tool for
connection anchor
5.
Ring nuts M20 with washers
6.
High-strength screwlock
7.
HDPE ring
!ATTENTION:
The foundation slab of the central foundation is found in the packing crate of the
net.