16
GENERAL
B
IDRA FI LE
S
A
B
C
D
RE
TR
AD
AD
M R
DSA
ICP
ICP
E
F
G
H
I
L
N
O
Q
UAC
MC
Psc
Pau
Psr
EAF
(SB)
RL
RC
(*)
(*) Cable routing
b
We recommend that you install isolating valves in the outlet and return lines.
b
Check the efficiency of the seals when filling/refilling the storage cylinder.
DESCRIPTION
300
UAC
Domestic hot water outlet
1” F
Ø
MC
Outlet from boiler
1” F
Ø
RC
Return to boiler
1” F
Ø
M
Outlet from solar collector
1” M
Ø
R
Return to solar collector
1” M
Ø
RL
DHW recirculation
3/4” F
Ø
EAF (SB) Domestic cold water inlet (storage cylinder drain)
1” F
Ø
Psc
Diameter/length of boiler sensor socket
16/175
mm
Psr
Diameter/length of solar controller sensor socket
16/175
mm
Pau
Diameter/length of auxiliary temperature sensor socket
16/175
mm
RE
Sleeve for electric heating element (not supplied)
1 ½” F
mm
AD1
Diameter/length of magnesium anode
33/450
mm
TR
Temperature gauge
DSA
Sensor/power cable entrance
ICP
Rear cable entrance
A
365
mm
B
955
mm
C
1420
mm
D
1490
mm
E
170
mm
F
445
mm
G
430
mm
H
955
mm
I
1035
mm
L
1200
mm
N
1410
mm
O
1670
mm
Q
1330
mm
S
825
mm