20
BELT REPLACEMENT:
For belt part numbers, refer to parts breakdown
section for parts identification.
a) Remove the belt guard.
b) Remove the auger shear bolt.
c) Remove the chain guard.
d) Unlink the chain by removing the connecting link
and take off the chain.
e) Remove the auger drive shaft assembly.
f) Remove the old V-belts and install the new V-
belts.
g) Reinstall the auger shear bolt.
h) Reinstall the drive shaft and secure in place.
IMPORTANT: Install the drive shaft and shear bolt
in first, to make sure that the parts are in their
proper locations.
i) Reinstall the roller chain with the connecting link.
j) Reinstall the chain guard.
k) After installing the belts, make sure the belts are
inside the pins (item 4). You may run the engine
without the belt guard but only to verify the belt
alignment. Do not leave the snowblower without
supervision. Neither you or anyone else must
approach the moving parts. Engage and
disengage the snowblower to verify if the belts are
well aligned, especially on the idler pulley.
Make
sure to hold the switch long enough so that the
pulley sits well on the belts.
If necessary, you
can add or remove a flat washer on the idler pulley
for final adjustments.
l) Reinstall the belt guard.
BELT REPLACEMENT
CAUTION
Never use the snowblower without the belt guard.
Belt replacement