A. Pass the 4600mm long Lower Cable (95) through the opening in the Leg
Developer (13). Lay a Pulley onto this Cable and secure into the Frame using
1 x M10 x 65mm Allen Bolt (31), 2 x Ø22mm x 15mm Bushing (47) and 1 x M10
Nylon Locknut (46).
B. Pull the Cable backwards, place the 2nd Pulley below it and secure using
the same components as in A above.
C. Guide the Cable around the Pulley and towards the back of the Frame.
Place the 3rd Pulley onto the Cable and secure 1 x M10 x 45mm Allen Bolt
(35), 2 x Ø10mm Washers (44) and 1 x M10 Nylon Locknut (46).
D. Repeat with the same components for the 4th Pulley.
E. Guide the Cable around the Pulley and downwards. Place the 5th Pulley
onto the Cable and secure with 1 x M10 x 60mm Allen Bolt (32), 2 x Ø22mm
x 13 Bushing (48) and 1 x M10 Nylon Locknut (46).
F. Draw the Cable around the Pulley then place the 6th Pulley onto the
Cable
and secure
1 x M10 x 45mm Allen Bolt (35), 2 x Ø10mm Washers (44) and
1 x M10 Nylon Locknut (46).
G. Guide the Cable around the Pulley, placing the 7th Pulley underneath then
securing this into the Cross Double Floating Pulley Bracket (16) using 1 x
M10 x 50mm Allen Bolt (33), 2 x Ø10mm Washers (44), 2 x Bushing (81),
2 x Cable Retainers (80) and 1 x M10 Nylon Locknut (46).
H. Continue routing the Cable as per the drawing placing the 8th Pulley onto
the Cable and securing with 1 x M10 x 45mm Allen Bolt (35), 2 x Ø10mm
Washers (44) and 1 x M10 Nylon Locknut (46).
I. Route the Cable up and over the 9th Pulley that is fitted into the Double
Floating Pulley Bracket (23) with 1 x M10 x 50mm Allen Bolt (33), 2 x
Ø10mm Washers (44), 2 x Bushing (81), 2 x Cable Retainers (80) and
1 x M10 Nylon Locknut (46).
J. Pull the Cable down and secure the end to the welded Bracket on the
Main Base Frame (1) with 1 x M10 x 28mm Allen Bolt (36), 2 x Ø10mm
Washers (44) and 1 x M10 Nylon Locknut (46).
Page