5
Bentone
• The electrical installation must be professionally carried out in
accordance with applicable high voltage regulations, as per Enertech’s
recommendations.
• Before servicing, shut off the fuel supply and turn off the power to the
burner.
• Seal inspections must be performed during installation and servicing to
prevent gas leakage.
• Care should be taken by the installer to ensure that no electrical cables
or fuel lines are crushed or otherwise damaged during installation or
servicing.
• If the boiler is equipped with an access hatch, this must be equipped
with a hatch opening switch connected to the burner's safety system.
• When in operation, the burner’s noise level can exceed 85 dBA.
Use hearing protection.
• The burner must not be put into operation without proper safety and
protection devices.
• A Class BE fire extinguisher is recommended.
• It is forbidden to alter thedesign or use accessories which have not
been approved by Enertech in writing.
• Prior to operation, the following points must be checked:
-
fitting and installation work has been completed and approved
-
electrical installation has been correctly performed
-
flue gas ducts and combustion air ducts are not blocked
-
all actuators and control and safety devices are in working order and
correctly set
Actions to take if you smell gas
Turn off the equipment and the boiler. Open windows and doors. Prevent
open flames or sparking, e.g. do not turn lights on or off, do not use any
electrical appliances, do not use mobile phones. Open windows and doors.
Close the gas ball valve. Warn residents; do not use doorbells. Evacuate
the building. Notify the installer or gas supplier once the building has been
evacuated.
Summary of Contents for BG 300 M-J/K-IP40
Page 17: ...17 Bentone 172 515 08 2018 01 02 4 8 Gas nozzle Natural gas Propan Biogas UV detector 2 5 8 0 ...
Page 36: ...36 Bentone 11 2 Wiring diagram BG300 BP JK IP 40 ...
Page 46: ...14 EU Declaration of conformity Bentone Gasburners ...
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com ...