24
Bentone
!
All gasline components shall be assembled and
mounted without bending, torque and outher
mechanical or thermal stress.
6. Multibloc MB-VEF B01, 407-412
Components
1.
Electrical connection gas
pressure switch mini
2.
Electrical connection gas valve
3.
Pressure switch mini
4.
Flange connection inlet
5.
Filter
6.
Data plate
7.
Connection 1/8" P
L
8.
Adjustment screw V for ratio
P
Br
: P
L
(max. load)
9.
Test point connection 1/8"
before V1 (before governor)
10. Adjustment screw for zero
point adjustment N (min. load)
11. Test point connection 1/8" P
F
12. Test point connection 1/8" P
Br
13. Flange connection, outlet
14. Test point connection 1/8" Pa
before V2 (after governor)
15. Indication of V1 and V2 in
operation (not standard)
16. O-ring
Check the filter at least
once a year!
It is possible to connect a leakage control VPS 504 and a gas pressure
switch maxi.
1
)
NB.
The impulse line P
Br
can be replaced by an impulse flange on the
multibloc. The impulse line P
Br
is then placed inside this flange.
172 515 16 2018-01-03
Summary of Contents for BG 300 M-J/K-IP40
Page 17: ...17 Bentone 172 515 08 2018 01 02 4 8 Gas nozzle Natural gas Propan Biogas UV detector 2 5 8 0 ...
Page 36: ...36 Bentone 11 2 Wiring diagram BG300 BP JK IP 40 ...
Page 46: ...14 EU Declaration of conformity Bentone Gasburners ...
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com ...