(c) If the current drawn is too low the duct outlet grilles will
require opening to reduce static pressure and increase air
volume, if this is not the case overheat cut outs can be caused.
3.4
Commissioning - hand over
(a) Upon full and satisfactory completion of commissioning,
a record of commissioning information (contact, date, etc)
should be left with the heater, a copy of which must also be
forwarded to the supplier (details on rear page)
(b) The commissioning engineer must ensure that the user is
familiar with the safe and effi
cient use of the heater, detailing
the function of all controls, and main components.
(c) The user should be made aware of the following in
particular
(i) Lighting, shutdown, and operational information.
(ii) Safety features, data plate, and labelling.
(iii) The requirement for regular inspection - especially if the
heater is within a more demanding environment - and the
need for regular servicing carried out by competent and
qualifi ed persons.
(d) Section 8 ‘User Instructions’ should be left with the
customer upon satisfactory completion of the commissioning
and hand-over.
Summary of Contents for OUH 2 100
Page 20: ...Wiring Diagram 33 65 245 Models OUHA OUHC40 ON OFF Riello Oil Fried Burner...
Page 21: ...Wiring Diagram 33 65 246 Models OUHA 60 70 ON OFF Riello Oil Fried Burner...
Page 22: ...Wiring Diagram 73 65 010 Models OUHA 90 100 ON OFF Riello Oil Fried Burner...
Page 23: ...Wiring Diagram 33 65 247 Models OUHC 60 100 ON OFF Riello Oil Fried Burner...
Page 24: ...Wiring Diagram 33 65 248 Models OUHA OUHC 40 HI LOW Riello Oil Fried Burner...
Page 25: ...Wiring Diagram 33 65 249 Models OUHA 60 70 HI LOW Riello Oil Fried Burner...
Page 26: ...Wiring Diagram 73 65 011 Models OUHA 90 100 HI LOW Riello Oil Fried Burner...
Page 27: ...Wiring Diagram 33 65 250 Models OUHC 60 100 HI LOW Riello Oil Fried Burner...
Page 35: ...Turbulator positions in models 40 70 8 off Turbulator positions in models 90 100 12 off...
Page 43: ...Notes...