
Document Index.
1 Installation requirements.
1.1 Compliance notices.
1
.2 Certifi cates of conformity.
1.3 General product information.
1.4 General requirements.
1.5 Delivery and pre-installation checks.
1.6 Warranty.
1.7 Health and Safety.
1.8 Location / Positioning.
1.9 Fuel supply.
1.9.1 Fuel.
1.9.2 Storage tanks.
1.9.3 Single pipe system (gravity fed).
1.9.4 Two pipe system.
1.9.5 Pressurised ring main system.
1.9.6 Pipework and fi ttings.
1.10 Electrical supply - general.
1.11 Air supply
1.11.1 Heaters installed within the heated space.
1.11.1.1 Natural ventilation openings to the
heated space
1.11.1.2 Mecanical ventilation openings to the
heated space
1.11.2. Heaters Installed within a plant room or
enclosure.
1.11.2.1 Natural ventilation openings to plant
rooms
1.11.2.2 Natural ventilation openings to
enclosures
1.11.2.3 Mech ventilation to a plant room or
enclosure.
1.12 Air distribution system.
1.13 Flue system.
1.14 Dimensions.
1.15 Technical details.
1.15.1 Reference information
2 Installation Instructions
2.1 Packaging/siting
2.2 Heater mounting
2.3 Minimum clearances
2.4 Warm air circulation
2.5 Flue installation
2.6 Oil installation/connection
2.7 Electrical installation/connection
2.8 Heater control installation
Wiring diagrams
3 Commissioning instructions
3.1 Commissioning - pretest
3.2 Commissioning - ignition
3.3 Commissioning - air delivery system.
3.4 Commissioning - hand over
4 Servicing instructions
4.1 Planned servicing.
4.2 Servicing procedure - Major component parts
4.2.1 Flue
4.2.2 Axial fan
4.2.3 Heat exchanger
4.2.4 Electrical supply
4.2.5 Oil supply
4.2.6 Burner
4.2.7 Air delivery system
4.2.8 Report
4.3 Service re-commissioning
5 Spare Parts
6 Fault Finding Guide
7 Replacing Parts
7.1 Burner
7.2 Controller
7.3 Electrode assembly
7.4 Nozzle
7.5 Photocell
7.6 Oil pump
7.7 Contactor
7.8 MCB
7.9 Fan/Limit stat assembly
7.10 Axial fan
8 User and Operating Instructions
8.1 Commissioning and hand over
8.2 Servicing
8.3 Start up procedure
8.4 Stop procedure
8.5 Shut down procedure
8.6 Ventilation only
8.7 Lockout situations
Summary of Contents for OUH 2 100
Page 20: ...Wiring Diagram 33 65 245 Models OUHA OUHC40 ON OFF Riello Oil Fried Burner...
Page 21: ...Wiring Diagram 33 65 246 Models OUHA 60 70 ON OFF Riello Oil Fried Burner...
Page 22: ...Wiring Diagram 73 65 010 Models OUHA 90 100 ON OFF Riello Oil Fried Burner...
Page 23: ...Wiring Diagram 33 65 247 Models OUHC 60 100 ON OFF Riello Oil Fried Burner...
Page 24: ...Wiring Diagram 33 65 248 Models OUHA OUHC 40 HI LOW Riello Oil Fried Burner...
Page 25: ...Wiring Diagram 33 65 249 Models OUHA 60 70 HI LOW Riello Oil Fried Burner...
Page 26: ...Wiring Diagram 73 65 011 Models OUHA 90 100 HI LOW Riello Oil Fried Burner...
Page 27: ...Wiring Diagram 33 65 250 Models OUHC 60 100 HI LOW Riello Oil Fried Burner...
Page 35: ...Turbulator positions in models 40 70 8 off Turbulator positions in models 90 100 12 off...
Page 43: ...Notes...