1.0
Compliance Notices
4
1.1
Certificates of Conformity
5
1.2
General Product Information
5
1.3
General Requirements
5
1.4
Delivery & Pre inspection
6
1.5
Warranty
6
2.0
Location & Positioning
7
2.1
Gas Supply
9
2.2
Electrical Supply
9
2.3
Air Supply
9
2.4
Minimum Space Requirements
12
2.5
Air Distribution System
12
2.6
Flue System
13
2.7
Flue Installation
17
3.0
Installation
17
3.1
Packaging & Siting
17
3.2
Flooring
17
3.3
Minimum Clearances
17
3.4
Assembly
17
3.5
Gas Installation & Connection
18
3.6
Electrical Installation & Connection
18
3.7
Air Distribution Installation
18
3.8
Warm Air Registers
18
3.9
Heater Control Installation
19
4.0
Commissioning
19
4.1
Pre test
19
4.2
Ignition
20
4.3
Air Delivery System
22
4.4
Hand Over
22
5.0
Servicing
23
5.1
Planned Servicing
23
5.2
Servicing procedure Major Components
23
5.3
Service Re commissioning
27
6.0
Fault Diagnosis By Flow Chart
28
7.0
Wiring Diagrams
30
8.0
Technical Data
36
CONTENTS
8.1
Cabinet Range Technical Data
39
9.0
Reference Documents Standards & Codes of Practice
43
9.1
Parts Listing
44
Summary of Contents for G20 I2H
Page 8: ......
Page 24: ...Motorised Fan Assembly 100 300 Fan and Motor Assembly 400 700 Fan and Motor Assembly 800 1300...
Page 31: ...Wiring Diagram 20 45 421 400 500 ON OFF Riello Gas or Oil Fired Burner SC FM 230 50 1ph 6A MCB...
Page 33: ...Wiring Diagram 20 45 420 100 300 ON OFF Riello Gas or Oil Fired Burner Remote SC SZ 230 50 1ph...
Page 34: ...Wiring Diagram 20 45 422 400 500 ON OFF Riello Gas or Oil Fired Burner Remote SC SZ 230 50 1ph...
Page 43: ......
Page 58: ......
Page 59: ......