
Positioning your projector
16
Positioning your projector
Choosing a location
Your projector is designed to be installed in one of four possible installation locations:
Your room layout or personal preference will dictate which installation location you select.
Take into consideration the size and position of your screen, the location of a suitable
power outlet, as well as the location and distance between the projector and the rest of
your equipment.
1.
Front Wall
Select this location with the projector
suspended upside-down from the wall in
front of the screen.
Purchase the BenQ Projector Wall
Mounting Kit from your dealer to mount
your projector on the wall.
2.
Rear Table
Select this location with the projector
placed on a table behind the screen.
Note that a special rear projection screen
is required.
*Set
Rear Table
in the
SYSTEM
SETUP: Basic
>
Projector
Installation
menu after you turn the
projector on.
3.
Front Table
Select this location with the projector
placed on a table in front of the screen.
This is the most common way to position
the projector for quick setup and
portability.
*Set
Front Table
in the
SYSTEM
SETUP: Basic
>
Projector
Installation
menu after you turn the
projector on.
4.
Rear Wall
Select this location with the projector
suspended upside-down from the wall
behind the screen.
Note that a special rear projection screen
and the BenQ Projector Wall Mounting
Kit are required for this installation
location.
*Set
Rear Wall
in the
SYSTEM
SETUP: Basic
>
Projector
Installation
menu after you turn the
projector on.