233
146876
Index F
18.4 UPPER LIMIT OF ANTIFOUL
The boat's hull has a shallow indent moulded along its length: the upper marking corresponds to the upper limit of antifoul
on the hull.
18.5 LAUNCH/LIFT OUT
The initial commissioning of your boat will require a lot of skill and care. The proper working of all your boat's equipment
is the result of the quality of the commissioning operations. This is why the initial launch must be overseen by your dealer.
Before launching
- Replace the log in its housing.
- Check the cleanliness of the sea water strainers.
- Check the anodes (see the chapter on Electricity).
- Check the propeller (see the chapter on Steering).
- Prepare enough fenders and lines.
- Check the engine's sea water intake valve and the fuel feed valve (see the chapter on motorisation).
18.6 STEPPING/UNSTEPPING THE MAST
The stepping /unstepping operations require the skills of a professional rigger: please consult your dealer.
Do not remain onboard or beneath the boat
during the handling operations.
- Before any handling, make sure that the
gear lever is in the forward position (Dock and
Go version).
- When placing the slings make sure that the
positioning marks are still visible.
- Submerge the sling fully under the engine
mounting.
Handling, tran
sport
18
18
Summary of Contents for OCEANIS 55
Page 1: ...146876 Index F OCEANIS 55 OWNER S MANUAL ...
Page 2: ......
Page 4: ......
Page 8: ......
Page 12: ......
Page 17: ...17 STABILITY AND BUOYANCY Stability data 18 Access to the boat 19 3 ...
Page 20: ...20 146876 Index F Access to the crew cabin Ladder Fitting Holding Stability and buoyancy ...
Page 26: ...26 146876 Index F STEP Rigging and sails ...
Page 28: ...28 146876 Index F STEP Rigging and sails ...
Page 54: ......
Page 89: ...89 LIQUEFIED PETROLEUM GAS LPG SYSTEM LPG The onboard gas system 90 Layout diagram 93 9 ...
Page 94: ......
Page 104: ......
Page 105: ...105 AUDIO VISUAL EQUIPMENT Television 106 Hifi 107 Layout diagram 108 11 11 ...
Page 124: ...124 146876 Index F 11 6 2 Generator LAYOUT DIAGRAM Onboard comfort ...
Page 164: ......
Page 171: ...171 146876 Index F DIAGRAM OF THE LAYOUT Engine 14 14 ...
Page 172: ...172 146876 Index F Engine ...
Page 173: ...173 146876 Index F Detail B 17 17 16 13 1 16 9 4 2 1 3 Engine 14 14 ...
Page 196: ......
Page 197: ...197 STEERING SYSTEM General points 198 Layout diagram 199 Bow thruster 204 15 15 ...
Page 199: ...199 146876 Index F 15 2 LAYOUT DIAGRAM 25 22 F 16 Steering system 15 15 ...
Page 200: ...200 146876 Index F 26 9 20 2 21 24 Steering system ...
Page 201: ...201 146876 Index F 3 22 4 5 6 7 8 23 24 11 13 14 15 19 9 10 12 Steering system 15 15 ...
Page 202: ...202 146876 Index F 22 1 24 25 17 18 20 14 1 1 Steering system ...
Page 222: ......
Page 228: ......
Page 236: ......