Installation Checklist
Following are the steps needed to install an XPR-10 Series Lift; perform them in this order.
☐
1. Review the Safety Rules.
☐
2. Plan for Electrical work.
☐
3. Make sure you have the necessary Tools.
☐
4. Review the Installation Orientation.
☐
5. Review Clearances around the Lift.
☐
6. Select the Installation Location.
☐
7. Choose a Wide or Narrow Configuration (
do not proceed until you have chosen
).
☐
8. Put Equalizing Cables into position.
☐
9. Add Extension Pieces for models with extensions.
☐
10. Put Hydraulic Lines into position.
☐
11. Create Chalk Line Guides for the Posts.
☐
12. Install the Posts.
☐
13. Prepare and install the Overhead Assembly, Safety Shutoff Bar, and the Microswitch.
☐
14. Install the Equalizing Cables.
☐
15. Route the Safety Lock Cable.
☐
16. Mount the Power Unit (
do not connect it yet
).
☐
17. Install the Safety Assemblies and the Safety Lock Cable.
☐
18. Connect the Hydraulic Lines.
☐
19. Learn about Arm Restraint Gears.
☐
20. Install the Lift Arms.
☐
21. Perform final Leveling.
☐
22. Contact the Electrician.
☐
23. Wire the Microswitch (
requires an Electrician
).
☐
24. Connect the Power Unit (
requires an Electrician
).
☐
25. Install the Power Disconnect Switch (
requires an Electrician
).
☐
26. Install the Thermal Disconnect Switch (
requires an Electrician
).
☐
27. Install the Safety Covers.
☐
28. Lubricate the Lift.
☐
29. Perform an Operational Test.
☐
30. Review the final Checklist.
☐
31. Leave the Manual with the owner/operator.
Summary of Contents for XPR-10 Series
Page 9: ...XPR 10 Series Two Post Lifts 9 P N 5900951 Rev D May 2019 Specifications ...
Page 77: ...XPR 10 Series Two Post Lifts 77 P N 5900951 Rev D May 2019 Labels ...
Page 78: ...XPR 10 Series Two Post Lifts 78 P N 5900951 Rev D May 2019 ...
Page 79: ...XPR 10 Series Two Post Lifts 79 P N 5900951 Rev D May 2019 ...
Page 81: ...XPR 10 Series Two Post Lifts 81 P N 5900951 Rev D May 2019 ...
Page 82: ...XPR 10 Series Two Post Lifts 82 P N 5900951 Rev D May 2019 ...
Page 83: ...XPR 10 Series Two Post Lifts 83 P N 5900951 Rev D May 2019 ...
Page 84: ...XPR 10 Series Two Post Lifts 84 P N 5900951 Rev D May 2019 ...
Page 85: ...XPR 10 Series Two Post Lifts 85 P N 5900951 Rev D May 2019 ...
Page 86: ...XPR 10 Series Two Post Lifts 86 P N 5900951 Rev D May 2019 ...
Page 87: ...XPR 10 Series Two Post Lifts 87 P N 5900951 Rev D May 2019 ...
Page 88: ...XPR 10 Series Two Post Lifts 88 P N 5900951 Rev D May 2019 ...
Page 91: ...XPR 10 Series Two Post Lifts 91 P N 5900951 Rev D May 2019 Maintenance Log ...