![BendPak R76LT Technical Service Bulletin Download Page 7](http://html.mh-extra.com/html/bendpak/r76lt/r76lt_technical-service-bulletin_2732367007.webp)
R76LT Installing the Tilt Tower
Page 7 of 9
BendPak TSB 82-092021
To Install the Inflation Gauge
:
1.
Locate the Inflation Gauge mounting on the left side of the Tilt Tower. Remove and retain the two
M6 Machine Screws, Lock Washers and Washers from the Tilt Tower.
2.
Retrieve the Inflation Gauge from its bag or protective wrap. Orient the Inflation Gauge so the Air
Lines are exiting at the bottom and the Gauge faces forward. Secure the Inflation Gauge to the Tilt
Tower using the M6 Screws, Lock Washers and Washers removed in the previous step. Refer to
the photo below.
3.
Route the Blue and Orange Air Lines from the Inflation Gauge behind the Air Pressure Regulator
and Oiler into the push-to-connect Pneumatic Couplings on the Blue and Orange Air Lines coming
out of the Tire Changer.
⚠
WARNING
The Tire Changer uses pneumatic and electrical energy; if your organization has
Lockout/Tagout policies, implement them once the unit is connected to the Air
Source.
4.
Install the Air Line Quick Disconnect using either PTFE Thread Sealant or Teflon
®
Tape.