R76LT Installing the Tilt Tower
Page 1 of 9
BendPak TSB 82-092021
BendPak Technical Service Bulletin
R76LT Installing the Tilt Tower, Inflation Gauge and Bead
Breaker
Ranger TSB 82 – 092021
The purpose of this Technical Service Bulletin is to detail changes to the Manual not currently reflected
in the latest R76LT Series Installation and Operation Manual P/N 5900346 (dated December 2019 -
Revision C).
Installing the Tower, Inflation Gauge and the Bead Breaker
(R76LT Only)
After removing the shipping cover, remove the components from where they are secured on the
shipping pallet and install the Tower/Swing Arm, Inflation Gauge and Bead Breaker on the Tire
Changer Cabinet.
Tools required:
•
Open end Metric Wrenches
•
Utility Knife
•
Hex Keys, Metric
•
Screwdriver set, Slot and Phillips
•
Pliers
•
Rags
•
Hammer or Mallet
•
Shop Crane or Forklift
•
Pry Bar
To Install the Tilt Tower on the Tire Changer
:
⚠
WARNING
Wear OSHA-approved (publication 3151) Personal Protective Equipment: leather
gloves, steel-toed work boots, back belts, hearing protection, and ANSI-approved
eye protection (safety glasses, face shield, or goggles). Keep rags nearby to remove
excess grease.
1.
Remove the Accessories and Covers on top of the Tire Changer and store in a safe place for later
use.
2.
Carefully remove the plastic wrapping the Tire Changer, but do not free the Tilt Tower located on
the side of the Tire Changer.
3.
Retain any parts located in bubble wrap or plastic bags and store with Accessories previously
removed.
4.
The Tower is secured to the shipping pallet in several locations.
Carefully
remove the plastic and
strap that secures the Tilt Tower to the Tire Changer.
⚠
WARNING
Use care when moving the Tilt Tower. The Tower is top heavy and the weight is not
distributed evenly. If it is dropped, you could injure yourself, bystanders and
damage the equipment.