3. After routing the Cables double-check to make sure all
are properly positioned and remain within the grooves of ALL
Sheaves. (See Fig. 9.4 - 9.5)
STEP 10
(Power Unit Installation)
1. Mount the Power Unit, Air Valve Mounting Bracket,
Vibration Dampner, and Flex Tube Mounting Bracket to
the Power Unit Mounting Bracket using the M8 hex bolts
and Nylock Nuts. Fill the reservoir with 12 quarts of 10-WT
hydraulic oil or Dexron automatic transmission fluid.
(See Fig. 10.1)
18
Fig. 9.3
Fig. 10.1
Fig. 9.2
Fig. 9.4
Fig. 9.5
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS WITH OUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR PANEL
AND CANNOT BE RE-ENERGIZED UNTIL ALL
MAINTENANCE AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.