STEP 6
(Powerside Runway Installation)
1. Locate the Powerside Runway easily identified by the
Cylinder and Sheave Roller mounting structures welded on the
underside. The Powerside Runway will be positioned on the
side of the lift where the Power Unit is installed.
(See Fig. 6.1)
2. Install the Cylinder and Cable Block as shown. Ensure the
snap ring is installed on the cylinder rod. (See Fig. 6.2 - 6.3)
3. Remove any pre-installed Cable Sheaves from the Powerside
runway making sure to pay attention to the order in which they
are removed. (This will help at the time of
re-installation.) (See Page 15)
ENSURE THAT THE FRONT POST UPPER
AND LOWER SLIDE BLOCKS ARE ORIENTED
AS SHOWN IN FIGURE 3.3 ON PAGE 12.
BEFORE PROCEEDING.
4. Position the Powerside Runway on top of the Cross Tubes
with the utility rail towards the center. The fitting holes located
at the side of the Powerside Runway should be adjacent to the
Power Unit Column. Align the holes in the Runway with the
holes on the Cross Tubes and bolt together using four M12
x 7.75 x 90 Hex Head Bolts and Washers.
(See Fig. 6.4)
STEP 7
(Offside Runway Installation)
1. Position the Offside Runway on top of the Cross Tubes
with the utility rail located inside. (See Fig. 7.1)
DO NOT PROCEED
with cable installation or go near the lift
work area unless visual confirmation is made of ALL
safety locks. ALL locks MUST be engaged before
proceeding. Failure to comply with these instructions may
result in severe personal injury or death. (See page 14.)
15
Fig. 6.4
Fig. 7.1
Fig. 6.1
Fig. 6.2
Fig. 6.3
Powerside
Runway
Offside
Runway