Pre-Installation Requirements
17
IP Panels © 2018 Bender Inc. All Rights Reserved
6. Pre-Installation Requirements
6. 1
General Requirements
Review all code, standards, and project requirements thoroughly before pro-
ceeding with installation.
Of particular importance is minimizing the cumulative system leakage current
in an isolated power system. NFPA 99 mandates an isolated power system’s
total line-to-ground insulation impedance shall exceed 200 kΩ. Excessive leak-
age current may result in non-conformance with this requirement.
NOTE:
In addition to adhering to all national, local,
and project-specific requirements, the installer shall
thoroughly review and understand all information
within this manual and relevant reference material.
Applicable material includes, but is not limited to:
• NFPA 99 - 2012: Healthcare Facilities Code Chapter 6
• NFPA 70: National Electric Code (NEC), Article 517
• (Canada) CSA C22.1: Canadian Electrical Code (CEC,
CE-Code), Section 24
• (Canada) CSA Z32: Applications of Electricity in
Healthcare
Summary of Contents for B662406
Page 1: ...Isolated Power Panels For Healthcare Facilities NAE209501 2 02 2019 T M EN Manual...
Page 21: ...Installation 21 IP Panels 2018 Bender Inc All Rights Reserved...
Page 34: ...34 IP Panels 2018 Bender Inc All Rights Reserved Installation 7 9 2 MIC Series...
Page 35: ...Installation 35 IP Panels 2018 Bender Inc All Rights Reserved 7 9 3 MID Series...
Page 43: ......