background image

Page 29

A

C

C

OL

ADE

  

2000

2.0  INSTALLATION

Before commencing the electrical work check 
that  the  power  source  is  in  accordance  with 
section 1.2 Site Requirements and ensure that 
it is isolated.

When  installing  the  indirect  unit  the  boiler 
manufacturers  wiring  instructions  should  be 
read in conjunction with this manual.

Run the external wiring through the service slot 
provided in the base of the appliance.

Make the connections as shown opposite on 
the terminal strip provided.

before  switching  on  the  electrical  supply 
check  all  the  factory  made  terminal 
connections to ensure they have not become 
loose during transit and that the appliance 
is full of water.

frost Protection

When  frost  protection  is  required  for  the 
whole house set the programmer to constant 
during the time required and adjust the room 
thermostat to a suitable setting.

2.2 INSTALLATION

Summary of Contents for ACCOLADE 2000

Page 1: ...ns before commencing installation and on completion leave adjacent in the pocket on the back of the appliance front panel In the interest of continuously improving the Accolade2000 range Gledhill Wate...

Page 2: ...lades now include a Benchmark Installation Commissioning and Service Record Log Book Please read carefully and complete all sections relevant to the appliance installation The details of the Log Book...

Page 3: ...ese appliances have been certified for safety and therefore it is important that these instructions are followed The appliance and installation specifications of the appliances must not be modified un...

Page 4: ...ety Document No 635 and the Electricity at Work Regulations 1989 The detailed recommendationsarecontainedinthecurrentissueofthefollowingBritishStandards and Codes of Practices BS 5440 Pts 1 2 BS 5449...

Page 5: ...d to be heated indirectly by a gas or oil fired boiler and are available for use with both openventedandsealedheatingsystems These appliancesarealsofittedwitha3kWimmersion heater for heating the hot w...

Page 6: ...h c i t s e m o D 9 s e Y e v l a v e n o z r e t a w t o H 0 1 s e Y e v l a v e n o z g n i t a e h e c a p S 1 1 s e Y p m u p m e t s y S 2 1 s e Y e v l a v s s a p y b c i t a m o t u A 3 1 s e...

Page 7: ...Page accolade 2000 1 0 design 1 2 technical data Indirect model photo Figure 1 1 Direct model photo T B A when available Figure 1 2...

Page 8: ...liance and any other ancillary equipment The minimum airing cupboard dimensions and the clearances required for installation and service are shown in figure 1 3 The appliance is designed to be install...

Page 9: ...ted Therefore the flow rate from the appliance depends upon the resistance of the hot water supply network capacityoftheincomingmainsand thecharacteristicsofthepressureregulating valve Typical hot wat...

Page 10: ...M l e d o M f t h g i e H D h t d i W E h t p e D D I 0 2 1 0 9 8 1 0 0 7 0 0 6 D I 0 5 1 0 2 1 2 D I 0 8 1 0 5 3 2 D I 0 1 2 0 0 7 2 D 0 4 1 0 0 3 1 D 5 7 1 0 5 7 1 D 0 1 2 0 0 1 2 Note The appliance...

Page 11: ...ly one common isolator for the Indirect Accolade appliance the boiler and any external controls It must provide complete electrical isolation for the whole heating and hot water system via a fused dou...

Page 12: ...0 6 l o r t n o C r e t a e h n o i s r e m m I m o t t o B p o t s a e m a S e v l a v e n o z g n i t a e H m m 2 2 m m 8 2 e v l a v e n o z r e t a w t o H m m 2 2 m m 8 2 p m u p m e t s y S 0 5...

Page 13: ...esigned to be connected directly to the mains without a check valve The hot water flow rate achievable from the Accolade 2000 is directly related to the adequacy of the cold water mains serving the pr...

Page 14: ...utlet connection on the appliance However in larger dwellings with a number of bathrooms and en suites and long pipe runs the balanced cold supply must be provided with its own pressure regulating val...

Page 15: ...e 2 of the Water Supply Regulations 1999 d A bidet can be supplied from the Accolade 2000applianceaslongasitisoftheoverrim flushingtypeandincorporatesasuitableair gap Dead leg volumes and secondary ho...

Page 16: ...orrect model Plastic pipework All recommendations with regard to pipework systems in this manual are generally based on the use of BS EN Standard copper pipework and fittings However plastic pipework...

Page 17: ...mostat is installed should be fitted with lock shield valves on both connections The bypass valve is set at the factory to 2m head but this should be adjusted on site by theinstallertoensurethattherei...

Page 18: ...0o C to 110o C see BS 5449 1990 clause 16 2 When calculating the system water content the water content of the primary heat exchanger see table 2 1 must be included The expansion vessel requirements a...

Page 19: ...anual Air Vent Figure 2 4 Schematic diagram of open vented heating system Cold feed expansion and safety open vent The cold feed connection is provided at the top of the appliance The safety open vent...

Page 20: ...bovethe water level see diagram 1 Onto the ground drive parth or garden area Thepipeshoulddischargedownwards andbenomorethan100mmaboveground level A wire cage should be provided to prevent people comi...

Page 21: ...pboards formed on bulkheads or at the mid span of a suspended floor In these cases the situation can be improved by placing the appliance on a suitable sound deadening material i e carpet underlay or...

Page 22: ...pliance should be handled carefully to avoiddamageandtherecommendedmethod isshownopposite Furtherdetailsareprovided on page 2 of these instructions Before installation the site requirements should be...

Page 23: ...t to check that they are compatible Written approval has already been obtained for Hepworth Hep2O BiTite John Guest Speedfit Yorkshire Tectite However as similar assurances cannot be obtained for Poly...

Page 24: ...sily observed It shall also be installedinasizeandmaterialsuitableforusewithheatingfeedandexpansioncisterns in accordance with BS 5449 and should not have any other connections to it SS Model The expa...

Page 25: ...ersion heater Inside immersion heater head Pump 3A Fuse Safety Limit thermostat Red LED_1 Contactor coil 2 Pole CO switch L N N N L L Room therm ostat Energy cut out thermostat Control thermostat prog...

Page 26: ...T_1 Red LED_2 HW ON HT ON 2 Green LED 5A fuse A1 A2 1 2 3 4 2 pole CO switch L N E L N E Immersion heater L N E Pump L N E Pump N N To Boiler E L L N N E E L L S L N N E E To Room thermostat L 2 From...

Page 27: ...Ver 260603 A1 A2 1 2 3 4 E L N E N ON PEAK Supply 230V 16A 50Hz L L N E L SL Ranco OHT_1 Red LED L N E OFF PEAK Supply 230V 16A 50Hz TOP On Peak IH L N E TOP Peak IH L N E A1 A2 1 2 3 4 BOTOM Off Pea...

Page 28: ...the connections as shown opposite on the terminal strip provided The appliance is provided with a link between terminals 11 and 12 on the terminal strip This must be removed if a room thermostat is fi...

Page 29: ...heexternalwiringthroughtheserviceslot provided in the base of the appliance Make the connections as shown opposite on the terminal strip provided Before switching on the electrical supply check all th...

Page 30: ...must be followed Cleansing the Primary System It is very important to ensure that the Primary system is cleaned using a suitable cleansing agent such as Sentinel X300 or Fernox Superfloc to ensure tha...

Page 31: ...1 Do ensure that the electrical connections e g mains supply room thermostat to the unit are correct and tight 2 Do ensure that the functioning and control of the system is explained to the occupant...

Page 32: ...conspicuous external position DO check the pump setting to give a temperature difference across the flow and return of not more than 11 C DO ensure that the bypass valve is set correctly DON T use pi...

Page 33: ...pump has been replaced to ensure that any air is adequately vented 1 m o r f n e e r c s e h t e v o m e r f f o d e n r u t y l p p u s r e t a w e h t h t i W f f o n a e l c d n a e v l a v t e l n...

Page 34: ...l a V e n o Z r e t a W t o H d a e h e l b a v o m e r h t i w l l e w y e n o H 0 1 e v l a V s s a p y B c i t a m o t u A p a m o C 1 1 e v l a V m u u c a V i t n A 6 5 0 T G 2 1 O R P O R P O R...

Page 35: ...Page 35 accolade 2000 3 0 SERVICING 3 3 SHORT PARTS LIST 1 2 3 4 5 6 10 12 8 9 15 16 17 19 20 21 7 11 13 14 18...

Page 36: ...ES If the units are not getting hot and the heat source is electrical ensure that the immersion heaters are isolated from the mains before re setting the energy cut out If the immersion heater s need...

Page 37: ...ONS FOR SHOWERS 4 FIXING OPTIONS FOR TAPS MIXERS 1 MK Range Combined Regulators Aerator for screwing onto Taps Mixers with internal or external threads on their noses AntiVandal models also available...

Page 38: ...6mm fixing holes 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 55mm 18 l mm 12 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 9 l mm 12 l mm inlet 165mm 595mm A hot B cold blank bl...

Page 39: ...ation and the resistance characteristics of the pipes The examples presented below are for 15mm copper pipe in table 1 and for plastic pipework in table 2 The preferred solution where space will allow...

Page 40: ...branched off the cold water main prior to the treatment device instead of the cold water manifold Any other isolating control valves and backflow protection devices should be provided as necessary to...

Page 41: ...terials or workmanship we will either repair or supply replacement at our option with the closest substitute in the case of any obsolete product to any address in Great Britain i free of all charge du...

Page 42: ...any other contract between the Purchaser and us which at the time of payment of the full price of the goods sold under this contract have been delivered to the Purchaser but not paid for in full c unt...

Page 43: ......

Page 44: ......

Reviews: