Page 22
2.0 INSTALLATION
Preparation/placing the appliance in
position
Details of the recommended positions for
termination of the first fix pipework are
provided in section 1.2 Technical Data. The
pipework can be located or its position
checked using the template provided with
each appliance. If thse have been followed
installation is very simple and much quicker
than any other system. The appliance
is supplied shrink wrapped on a timber
installation base. Carrying handles are also
provided in the back of the casing.
A feed and expansion cistern complete with
ballvalve, cold feed/expansion and overflow/
warning fittings are provided in a separate
box with the OV models. If the SS model
is provided the box will contain a primary
system expansion vessel. It is the installers
responsibility to check that the size of cistern/
expansion vessel provided is adequate for the
primary/heating system being installed. If
flexible connection have been ordered these
will also be inside the feed and expansion
cistern/expansion vessel box.
The appliance should be handled carefully to
avoid damage and the recommended method
is shown opposite. Further details are provided
on page 2 of these instructions. Before
installation the site requirements should be
checked and confirmed as acceptable. The
plastic cover and protective wrapping
should be removed from the appliance and
the installation base (provided) placed in
position.
The appliance can be then be lifted into
position in the cupboard on top of the base
and the front panel removed by unscrewing
the 2 screws and lifting the door up and out
(see opposite) ready for connection of the
pipework and electrical supplies. If they are not
being fitted on top of the appliance a support
shall be installed for the feed and expansion
cistern/expansion vessel ensuring that the base
is fully supported and the working head of the
boiler/system is achieved. The recommended
access for maintenance must also be provided
- see section 1.2 Technical Data.
2.2 INSTALLATION
When lifting the unit work with someone of similar build and height if possible
Choose one person to call the signals
Lift from the hips at the same time, then raise the unit to the desired level
Move smoothly in unison
Larger units may need team lift
Photo of Accolade with front cover open