8
Installation
–
Fire Preparation
continued…….
200820
Diagram 5
Diagram 6
Locate the
LED Downlight Kit (Box B)
and the
Downlight
Extension Cable and Instruction. (Inside Box A).
Note: Before proceeding further ensure the Tabs on the
2 x Support Brackets are bent up over and facing
inwards slightly. See Diagram 6.
Discard
the
2 Light Led Kit With Sensor Instruction
(Inside Box B)
and instead follow the
2 Light Led Kit With
Sensor Instr 2M Extension Cable Instruction
(Inside Box A)
and proceed to install the
LED Downlights,
2M Extension Cable
and
Sensor Switch
as detailed.
Note: The Sensor Switch can be installed in the left Or
Right
Support Bracket
.
Note: Later during the installation, when the fire is
installed into the surround base, all the excess cables
should be positioned to the Sensor Switch side of the
installation, this will aid with servicing, in the unlikely
event a defect occurs.
Depending on the model purchased:
050164
–
(1000-3SL) - Fix the supplied
2 x Magnet
Support Brackets
to the base of the fire using the
previously removed
4 x Screws
.
See Diagram 5.
050172
–
(1250-3SL) - Fix the supplied
3 x Magnet
Support Brackets
to the base of the fire using the
previously removed
6 x Screws
.
See Diagram 5.
Note: The holes left in the top of each Magnet Support
Bracket will be used in a later procedure.
Tabs
Once all the supplied brackets have been fixed to the
fire, please proceed to the next stage of the installation
process -
Stud Wall / Masonry Wall Installation.
Note: Place the fire safely to one side away from the
installation site, to avoid it being damaged before
being installed, later in the installation process.
Diagram 7