6
Installation
–
Introduction
Before the surround and fire can be installed, consideration will need to be given on routing the power supply for
the fire. This will affect the stages of the installation process. We advise a qualified electrician conduct any
electrical parts of the installation.
Note: A double socket is required for the operation of the Fire and the LED Downlights.
Unpack your new suite-
DO NOT
dispose of the packaging until you have checked and made sure all the parts and
fixings listed on
Pages 4 & 5
are present.
Tip
: To help avoid damage of the assembled parts place them on the
surplus packaging, whilst they are waiting to be installed.
Note: This installation guide is detailed for both 54” and 64” sized surrounds so please familiarise yourself with
the model you have purchased before beginning installation.
Note: The surround and fire are a two adult person lift. A second person will be required to lift and support
the surround and fire during installation.
200820
Installation
–
Fire Preparation
Diagram 1
Smal
l
Box
Large
Box
Preparing the fire - See the separate Fire Instructions.
Depending on the version purchased, locate the box
containing the
Fire 050164
or
050172
and locate the
separate
Fire Operating Instructions
.
Please refer to
Page 8-9,
in the separate
Fire Operating
Instructions
and follow the steps to remove the
Glass,
Rear Bracket
and the internal
Cardboard Boxes
.
Once the
Cardboard Boxes
have been removed
remember to check the contents, as detailed on
Page 7,
in the separate
Fire Operating Instructions
.
Note: The Brackets removed from the fire and supplied
inside the fire are no longer required and can be
discarded or kept somewhere safe should you require
them in the future.
Place all other components safety to one side as these
will be required later during the installation.
Note: The fire is a two adult person lift.