![Belshaw Brothers Donut Robot Mark VI Operator'S Manual Download Page 25](http://html1.mh-extra.com/html/belshaw-brothers/donut-robot-mark-vi/donut-robot-mark-vi_operators-manual_2730391025.webp)
Belshaw Adamatic Bakery Group
•
www.belshaw-adamatic.com
•
206-322-5474
•
Donut Robot Mark VI Technical Supplement
MN-1033EN
7
7 Insert the swing column into the swing
column-mounting bracket. Make sure the
plastic spacer washer is on the swing column
between the set collar and the swing
column-mounting bracket. (See Figure 1-3.)
8. Connect the swing connecting rod to the
throw arm of the swing column. A locating
pin on the swing connecting rod rests in a
hole in the throw arm. (See Figure 1-4.)
Figure 1-4. Connecting the Swing
Connecting Rod.
If you are preparing to make yeast-raised donuts,
skip steps 7 and 8 and proceed to step 9.
9. Be sure your power source matches the
specifications on the data plate. Connect the
machine to the power source.
10. Turn on the conveyor only and check to see
that it operates smoothly. The power switch
for the conveyor drive is on the heater head.