INSTALLATION CONT’D
Assembly Cont’d
•
Raise the front header cover into position between the front jambs and slip it over the header frame until it
is flush with the front. Install two drill-tip screws through the top flange of the header cover. Install 5 mm
stainless steel sheet metal screws through the bottom flange of the header cover. Use care to keep the
gasket in place.
•
Install 6 mm x 12 mm truss head stainless steel screws through the inner ceiling joint, inside the oven.
•
Place the floor clamp strips around the inside walls of the oven. Install, using 6 mm x 12 mm truss head
screws, washers and lock-washers; longer screws are provided for the overlapping joints at the corners. Do
not tighten these screws until the oven has been placed at its final location and leveled.
Note: Lifter installation is not required on some ovens
•
Place the lifter assembly on top to the oven without the rotator assembly. Center the lifter over the rotator
shaft housing with the lift motor to the rear of the oven.
•
Install the rotator assembly through the lifter, using care to locate the spring-steel clip between the
elevation micro-switches.
•
Move the lifter assembly around until the rotator assembly is clear of the lifter frame and all moving parts
are free (this should be where the lifter is centered on the rotator shaft). Anchor the lifter assembly in place
with the fasteners provided.
•
Remove the snap ring, square washer and shipping spacer from the rotator shaft.
•
Remove the rack carrier from the bottom of the hood crate. Install the carrier on the rotator shaft inside the
oven using the snap ring provided. Install the four set-screws in the carrier-shaft collar. Do not tighten yet,
as this will allow the carrier to be aligned later.
•
Install the end of the flex conduit from the blower motor into the lift frame.
•
Uncoil the hi-limit switch from the hi-limit protector bracket and install in the side of the lifter frame with
the screws provided.
•
Install the door micro-switch, (shipped wired to the lifter frame) at the door switch actuator bracket above
the loading door. Adjust the switch for 1/8” over travel. Adjust the switch actuator for maximum travel.
•
Connect the wires (34, 35 and 36) from the blower motor to the same wires in the lifter frame.
•
Connect the wires (48 and 49) to the terminal at the high-limit switch.
•
Connect the white plastic connector from the main harness to the white plastic connector on the lifter
harness.
•
Check the location of all of the wires to ensure that they are free of sharp edges or moving parts.
•
Install the transport wheel on the left jamb by raising the oven with the left front jackscrew, located behind
the control door. Use the pan head machine screws provided.
•
Extend the transport wheel by adjusting the leveling jack-screws in the rear.
Summary of Contents for BARO-G
Page 2: ......
Page 4: ......
Page 22: ...ETL3028821 20 REV B2006...
Page 35: ...ETL File 3028821 33 V B2006 Electrical Connections See page 16...
Page 42: ...ETL File 3028821 40 V B2006...
Page 43: ...ETL File 3028821 41 V B2006...
Page 44: ...ETL File 3028821 42 V B2006...