6
G87
V
V
BUILDING-IN THE APPLIANCE
INSTALLATION DIMENSIONS
WARNING
Always use the recommended measurements of the build-in opening, as shown in the table on page 5
and the diagrams below. To make sure the appliance is properly aerated, remove the rear panel of the base module
or make a hole (A), as shown in the figure below.
FIXING THE APPLIANCE
Push the appliance into the cabinet, open the oven door
and drill pilot holes 2mm x 5mm deep, through the holes
in the frame at the sides into the sides of the cabinet.
Fix the oven to the cabinet with the enclosed screws
(V).
Take care not to tighten the screws too much as this
may cause damage to the cabinet sides or the appliance
enamel
BEFORE COOKING
Before you cook for the first time, we recommend that
you switch on each element in turn to burn off any
odours remaining from manufacture. Simply operate the
grill on maximum for a few minutes, and the oven for
about 30 mins. Although the smell is harmless, we would
recommend that you open the window to allow fresh
air to circulate during this procedure.
597
595
540
560
40
560
570
570
550
550
A
A
560