BHT-430-MM-2
5-00-00
SPECIAL INSPECTIONS
5-41.
AFTER 1 TO 5 HOURS OF OPERATION FOLLOWING EACH INSTALLATION
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: __________________________________________
HELICOPTER S/N: ___________________________________
REGISTRY NO.: _____________________________________
TOTAL TIME:_______________________________________
SIGNATURE:_______________
_________________________
Chapter 62
NOTE
Torque application for the thru-bolts and nuts must
be performed in a specific sequence.
MAIN ROTOR YOKES
1.
Following each installation, verify torque of the eight
through-bolts and nuts attaching the main rotor yokes to the
main rotor mast. Repeat the torque verification every 1 to 5
hours until torque stabilize to 60 to 65 foot-pounds (81.35 to
88.12 Nm). (R1)
TAIL ROTOR
Chapter 64
1.
Following each installation, verify the torque of the nut
attaching the tail rotor hub assembly to the tail rotor gearbox
output shaft. Repeat the torque verification every 1 to 5 hours
until torque stabilize to 40 to 50 foot-pounds (54.24 to 67.79
Nm) (R2).
26 JAN 2007 Rev. 15
Page 107/108
Summary of Contents for 430
Page 6: ......
Page 12: ......
Page 16: ......
Page 36: ......
Page 68: ......
Page 74: ......
Page 82: ......
Page 88: ......
Page 114: ......
Page 116: ......
Page 124: ......
Page 130: ......
Page 132: ......
Page 134: ......
Page 136: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 144: ......
Page 146: ......
Page 154: ......
Page 168: ......
Page 172: ......
Page 176: ......