BHT-430-MM-2
5-00-00
26 JAN 2007 Rev. 15
Page 71
SCHEDULED INSPECTIONS
5-26.
PROGRESSIVE INSPECTION — EVENT 11
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: __________________________________________
HELICOPTER S/N: ___________________________________
REGISTRY NO.: _____________________________________
TOTAL TIME:_______________________________________
SIGNATURE:_______________
_________________________
GENERAL:
Paragraph 5-13
1.
Do a complete 50 hour inspection.
DETAIL:
Chapter 67 and
BHT-ALL-SPM
1.
Open the access panels in the tunnel behind the pilot
station. Examine the lower and upper cyclic and collective pitch
control bellcranks for loose bearings, corrosion or mechanical
damage to the clevises. Make sure they are correctly attached
to the supports and control tube bearings. (F5/F6)
Chapter 71
2.
Examine the engine control cables and idle stop solenoids
for corrosion and damage. Make sure they are correctly
attached. (F5/F6)
NOTE
Examine inspection window(s) and sight glass(es)
for cracking and discoloration. If either of these
conditions are present the part must be removed and
replaced prior to returning helicopter for service.
Chapter 63
3.
Examine the left and right pylon fluid mounts for corrosion,
damage and correct fluid level. Make sure they are correctly
attached. (F5/F6)
Chapter 63 and
BHT-430-CR&O-2
4.
Examine the upper and lower lift link rod end bearings for
serviceability. (F5/F6)
Summary of Contents for 430
Page 6: ......
Page 12: ......
Page 16: ......
Page 36: ......
Page 68: ......
Page 74: ......
Page 82: ......
Page 88: ......
Page 114: ......
Page 116: ......
Page 124: ......
Page 130: ......
Page 132: ......
Page 134: ......
Page 136: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 144: ......
Page 146: ......
Page 154: ......
Page 168: ......
Page 172: ......
Page 176: ......