
INSTALLATION AND STARTUP
13-12
Belanger, Inc. ®* PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL220
Chapter 13 Water Softener Option
Water Softener Conversion Charts
Note:
The information in this portion of the document was supplied by Kinetico™.
Water Analysis
1 Grain per
US Gallon
1 PPM
1 French
Degree
1 German
Degree
1 Clark or
English
Degree
1 Mill Equivalent
per Liter
1 Grain per US Gallon
1.00
17.1
1.71
0.958
1.20
0.343
1 PPM
0.0583
1.00
0.10
0.056
0.07
0.020
1 French Degree
0.583
10.0
1.00
0.560
0.70
0.20
1 German Degree
1.044
17.9
1.78
1.00
1.24
0.357
1 Clark or English Degree
0.833
14.3
1.43
0.80
1.00
0.286
1Mill Equivalent per Liter
2.92
50.0
5.00
2.80
3.50
1.00
Linear
Inches
Feet
Yards
Miles
Millimeters Centimeters
Meters
Kilometers
Inches
1.0
0.08333
0.2778
0.00001578
25.4
2.54
0.0254
0.0000254
Feet
12.0
1.0
0.3333
0.0001894
304.8
30.48
0.3048
0.0003048
Yards
36.0
3.0
1.0
0.0005682
914.4
91.44
0.9144
0.0009144
Miles
63360.0
5280.0
1760.0
1.0
1609000.0
160900.0
1609.0
1.609
Millimeters
0.03937
0.003281
.0.001094 .0000006214
1.0
0.1
0.001
0.000001
Centimeters
0.3937
0.03281
0.01094
0.000006214
10.0
1.0
0.01
0.00001
Meters
39.37
3.281
1.094
0.0006214
1000.0
100.0
1.0
0.001
Kilometers
39370.0
3281.0
1094.0
0.6214
1000000.0
100000.0
1000.0
1.0
Volume
US
Quarts
US
Gallons
British
Imperial
Gallons
Cubic
Inches
Cubic Feet
Liters
Cubic Meters
US Quarts
1.0
0.25
0.2082
57.75
0.03342
0.9464
0.0009464
US Gallons
4.0
1.0
0.8327
321.0
0.1337
3.785
0.003785
British Imperial Gallons
4.804
1.201
1.0
277.4
0.1605
4.546
0.004546
Cubic Inches
0.01732
0.004329 0.003606
1.0
0.0005787 0.01639
0.00001639
Cubic Feet
29.92
7.481
6.229
1728.0
1.0
28.32
0.02832
Liters
1.057
0.2642
0.22
61.02
0.03531
1.0
0.001
Cubic Meters
1057.0
264.2
220.0
61023.0
35.31
1000.0
1.0
Summary of Contents for FreeStyler
Page 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Page 2: ......
Page 4: ......
Page 12: ......
Page 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Page 14: ......
Page 26: ......
Page 28: ......
Page 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Page 32: ......
Page 52: ......
Page 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Page 54: ......
Page 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Page 124: ......
Page 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Page 136: ......
Page 142: ......
Page 144: ......
Page 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Page 152: ......
Page 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Page 164: ......
Page 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Page 168: ......
Page 174: ......
Page 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Page 176: ......
Page 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Page 184: ......
Page 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Page 192: ......
Page 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Page 206: ......
Page 226: ......
Page 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Page 250: ......
Page 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Page 254: ......
Page 258: ......
Page 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Page 260: ......
Page 264: ......
Page 265: ... Chapter 19 Trades Chapter 19 Trades ...
Page 266: ......
Page 270: ......
Page 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Page 272: ......
Page 282: ......
Page 284: ......
Page 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Page 294: ......
Page 320: ......
Page 321: ......