
Installation
METPOINT
®
OCV
31
Installation of the sensor unit (steps 11 – 14)
11. Please screw the union nut (4) carefully onto
the screw-connection body (5) until the nut is
finger-tight.
12. Turn the sensor unit (1) with the probe (3) into
the desired position.
13. Now tighten the union nut (4) by means of an
SW 22 open-ended spanner with a quarter turn
in clockwise direction.
14. Using an SW 24 open-ended spanner which is
applied to the screw-connection body (5), you
will prevent twisting of the sensor unit (1).
Option:
Stainless steel ball valve with wing
Connection 3/8“
Oil- and grease-free
You will find installation instructions in the Appendix.
Summary of Contents for METPOINT OCV
Page 66: ...Declaration of conformity 66 METPOINT OCV 14 Declaration of conformity ...
Page 73: ......
Page 74: ......
Page 75: ......