
Installation
METPOINT
®
OCV
29
Unfastening of the stationary seal ring and of the screw-connection body (steps 5 – 6)
5. Remove the wrapped stationary seal ring (6)
from the METPOINT
®
OCV. The cable tie can
be undone by carefully using a side cutter.
6. Please unfasten the screw-connection body
(5) from the sampling probe by turning.
Mounting of the stationary seal ring and of the screw connection body (steps 7 – 8)
DANGER
!
Overpressure!
Observe the type plate indications regarding the maximum pressure!
It is imperative that the compressed-air line is pressureless prior to installation!
DANGER
!
Compressed air!
The process steps described in the following must be carried out by correspondingly qualified personnel.
Never carry out works on a plant which is under pressure.
The user must ensure that the METPOINT
®
OCV is never operated at a pressure exceeding the value
indicated on the type plate. Exceeding the maximum operating pressure can cause both injuries and severe
damage to the measuring device.
The sampling probe has a G 3/8’’ internal thread connection. Other connections are possible for custom-
made special probes.
The sampling probe must be installed vertically in the rising main.
Touch the sampling probe only at the upper part, in front of the housing. Hands/fingers exude grease which
may lead to incorrect measuring results.
The reference gas generation unit requires a pre-heating time of approx. two hours. Only after this pre-
heating time has expired may compressed air flow through the device.
Summary of Contents for METPOINT OCV
Page 66: ...Declaration of conformity 66 METPOINT OCV 14 Declaration of conformity ...
Page 73: ......
Page 74: ......
Page 75: ......