
Technical data
16
METPOINT
®
OCV
6.5 Illustration of the device
1
-
Sensor unit
2
-
Evaluation unit with user interface (display)
3
-
Sampling probe
4
-
Union nut
5
-
Screw-connection body with G 3/8” external thread
6
-
Stationary seal ring (2x)
7
-
User interface / touchscreen
8
-
Power supply cable for the sensor unit
9
-
Power supply cable for the evaluation unit
10
-
Signalling cable
11
-
Connection signalling cable sensor unit
12
-
Connection signalling cable evaluation unit
13
-
On / off switch incl. indicator (green LED)
14
-
Connection analogue output 4-20 mA (see Chapter 13.5.2, page 60)
15
-
Connection Ethernet
16
-
Measuring-gas connection "M"
19
-
Connection potential-free alarm contact (see Chapter 13.5.1, page 54)
20
-
Specification regarding the adjusted operating pressure
Summary of Contents for METPOINT OCV
Page 66: ...Declaration of conformity 66 METPOINT OCV 14 Declaration of conformity ...
Page 73: ......
Page 74: ......
Page 75: ......