10.3 Maintenance work
For maintenance work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must
have been completed.
Prerequisites
Tools
Material
Protective equipment
• Screwdrivers:
Cross-head size 2.5 mm (0.09")
Flat-blade size 2.5 mm (0.09")
• e.g. adjustable spanner
• Cleaning brush made of wire or soft
plastic material with
Ø max. = 1,5 mm (0.05")
Ø max. = 2,5 mm (0.09")
• Sealants
• Lubricant for greasing the O-rings
• Mild detergent
• Cotton cloth or disposable tissue
Always to be worn:
Preparatory tasks
1.
Decommissioning and disassembly must have been completed.
10.3.1 Wear parts exchange
Illustration
Description / explanation
3
2. Loosen the 4 pan-head screws
[3]
.
Original installation and operation manual
BEKOMAT
®
13, 13 CO, 13 CO PN25, 13 CO PN40
37 | 64
Summary of Contents for Bekomat 14
Page 57: ...Original installation and operation manual BEKOMAT 13 13 CO 13 CO PN25 13 CO PN40 57 64 ...
Page 62: ...BEKOMAT 13 13 CO 13 CO PN25 13 CO PN40 Original installation and operation manual 62 64 ...
Page 63: ...Original installation and operation manual BEKOMAT 13 13 CO 13 CO PN25 13 CO PN40 63 64 ...