
25 of 30
STEP 15:
Using an electronic stud finder and following the manufacturers
instructions for use, locate the studs in the wall as shown. Mark an “X” to indicate
the
CENTER
of the stud. Locate as many studs as you can within this space
(minimum of 3). This will vary for concrete, brick, or lathe and plaster walls.
In the locations where you have located and marked the center of the studs, drill a
⅛” pilot hole through the back of the Header. Do not go all the way into the stud
with this hole, just into the wood strip.
Finally, making sure that the gap around the bed is equal, drive a Black 3” Wood
Screw (
O
) into each predrilled hole and into the wall studs. You may consider
different fasteners for different wall types.
MAKE SURE THAT THE SCREWS ARE
Summary of Contents for ECONOMY MELAMINE MURPHY BED
Page 30: ...30 of 30 APPENDIX A ...